PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at the 1st floor detention cells Facing North.jpg Laying out block at the 1st floor Rooms along South Elevation.jpg Laying out block at the detention cells Facing West.jpg 1st floor sprinkler heads Facing North.jpg 2nd floor interior metal framing Facing North.jpg Installed door frame at the 1st floor sprinkler room Facing East.jpg
Previous pageNext page Laying out block at the 1st floor Rooms along South Elevation
Laying out block at the 1st floor Rooms along South Elevation